01 / The challenge
What we found on site
The existing substrate showed extensive deterioration — failed membranes, active leaks, and chloride-laden concrete that compromised long-term performance.
02 / Our approach
How TEXSA delivered
TEXSA mobilised a specialist crew for full strip-out, substrate repair, and reinstatement using liquid-applied pu + reinforcement. Works were sequenced around live operations with full QA/QC documentation.
03 / The result
Outcome on handover
12,000 m² roof strip-out, screed repair, and re-waterproofing. Delivered on programme with a 10-year system warranty and zero post-handover defects to date.
04 / Transformation
Drag to reveal
Before
AfterREF_TX02 · Before / AfterMussafah, Abu Dhabi
05 / Specification
System data sheet
System specificationDATA_SHEET
- System
- Liquid-applied PU + reinforcement
- Area
- 12,000 m²
- Duration
- 20 weeks
- Sector
- Industrial
- Service
- Roof Rehabilitation
- Location
- Mussafah, Abu Dhabi
- Year
- 2024
- Client
- Confidential — Industrial Operator
06 / Stage by stage
Gallery
Before
After
Before
After07 / Documentation
On-site photography
IMG_01






