Al Falah Plaza - Abu Dhabi
12,000 m² industrial roof strip-out, screed repair, and re-waterproofing with liquid-applied polyurethane and reinforcement.
The challenge
Saturated insulation and a brittle, cracked legacy bitumen membrane were producing recurrent leaks above live production lines, with limited access windows and high rooftop temperatures.
Our approach
Works were phased zone-by-zone around plant operations: removal of saturated insulation, screed repair, primer, reinforced liquid PU membrane and UV topcoat. Adhesion and DFT were verified per zone and signed off by the FM team.
System specification
- System
- Liquid-applied PU membrane with polyester reinforcement and UV-stable topcoat
- Area
- 12,000 m²
- Duration
- 20 weeks
- Sector
- Industrial
- Service
- Roof Rehabilitation
- Location
- Mussafah, Abu Dhabi
- Year
- 2024
- Client
- Confidential — Industrial Operator
Before / after
Before
AfterMussafah, Abu Dhabi