Skip to main content
Texsa Waterproofing Systems
United Arab Emirates

Concrete injection across the UAE — the right resin for the right defect.

TEXSA carries out polyurethane and epoxy injection for leaking cracks, construction joints, basements, tunnels, tanks and structural repairs throughout the UAE — diagnosed first, then injected under controlled pressure with recorded evidence.

PU or epoxy? The decision in one paragraph

If water is moving through the crack, the answer is polyurethane: it reacts with moisture, expands to fill the void, stops the flow and stays flexible as the structure moves. If the crack is dry, dormant and structural, the answer is epoxy: it is rigid, bonds the faces and restores the section to monolithic strength. Choosing epoxy on a wet or live crack is the single most common failure we are called back to fix. Getting that decision right requires a survey — crack width, movement, moisture and cause — before a single port is drilled.

Why TEXSA

Injection done as engineering, not as drilling.

Port spacing, drill angle, resin selection and pressure are set from the crack geometry and recorded per port.

  • ISO 9001 / 14001 / 45001 certified contractor operating across the UAE
  • Both PU and epoxy injection capability — we are not tied to one resin
  • Calibrated injection pumps with recorded pressures and resin take
  • Leak tracing and diagnostics before repair, not guesswork
  • Curtain injection capability for buried and inaccessible faces
  • Handover report with port log, photographs and verification results

How an injection job is controlled

DiagnosisCrack width, movement, moisture and cause established before drilling
Resin selectionPU for active water and movement; epoxy for dormant structural cracks
Port layoutSpacing and drill angle set to intersect the crack through its full depth
InjectionCalibrated pumps, controlled pressure, resin take logged per port
VerificationObservation over a wetting cycle or targeted water test, with photo record
Coverage

UAE coverage

Injection crews mobilise across all seven emirates.

  • Abu Dhabi
  • Dubai
  • Sharjah
  • Al Ain
  • Ajman
  • Ras Al Khaimah
  • Fujairah
  • Umm Al Quwain
  • Musaffah
  • Jebel Ali
  • Ruwais
  • KIZAD
FAQ

Concrete injection — answered.

Polyurethane resin is used to stop water. It reacts with moisture, expands and seals an actively leaking crack or joint, staying flexible afterwards. Epoxy is used to restore structure: it is rigid and bonds the two faces of a dormant crack back into a monolithic section. Using epoxy on a wet, moving crack is a common and expensive mistake.

Talk to an engineer

Stop the leak at the crack, not at the finish.

Send photographs and the location — a TEXSA engineer will advise whether PU or epoxy injection is correct and arrange a survey.

View projects