Engineering stories from the field.
Selected long-form references — the challenge on site, the system we engineered, and the verified outcomes.


8,500 m² municipal irrigation reservoir relined with pure polyurea.
A failed cementitious lining in a strategic Abu Dhabi irrigation reservoir was stripped, repaired, and re-protected with a 3 mm pure polyurea system — returned to service in 14 weeks with a 10-year warranty.
Selected references
3 of 3 studies
CS_0212,000 m² industrial plant roof rehabilitated without stopping production.
A leaking 12,000 m² industrial roof was stripped, screed-repaired, and re-waterproofed with a liquid-applied PU + reinforcement system — phased around 24/7 operations across a 20-week programme.
CS_03Mixed-use tower podium waterproofed under landscaped overburden.
6,200 m² of podium and planter waterproofing under landscaped overburden using pure polyurea with a drainage composite — engineered for root resistance, hydrostatic load, and 25-year design life.
Have a project we should write about next?
Share your scope — a TEXSA engineer will respond within one business day with a system proposal.