Roof Rehabilitation & Roof Waterproofing Solutions UAE

Roof rehabilitation repairs an existing roof that leaks, ponds water or has a failed waterproofing layer, instead of replacing the whole build-up. TEXSA surveys the roof, identifies the cause of the failure, then repairs the substrate, corrects falls and details, and installs a new protective and waterproofing system suited to UAE exposure.

Common applicationsCommercialIndustrialInfrastructureHospitalityRetail

Overview

Roof rehabilitation is the process of repairing, upgrading, and restoring existing roof waterproofing systems that have deteriorated due to age, water leakage, ponding water, UV exposure, thermal movement, failed coatings, or membrane deterioration. Rather than replacing the entire roof, rehabilitation focuses on identifying the root cause of failure, repairing damaged areas, and installing a suitable waterproofing system to extend the service life of the roof and improve long-term performance.

Common roof problems

Process

  1. 01

    Site inspection

    Every rehabilitation begins with a documented site inspection: water-ingress mapping, core sampling to identify substrate condition, and assessment of existing membrane chemistry to inform compatibility of overlay systems.

  2. 02

    Surface preparation

    Surface preparation is the single largest determinant of long-term performance. We remove failed coatings and contaminants by diamond grinding, shot blasting, or vacuum-assisted scarifying, then verify substrate moisture, pH, and profile before priming.

  3. 03

    Concrete and substrate repair

    Spalled and delaminated concrete is removed and reinstated with EN 1504-compliant polymer-modified repair mortars. Exposed reinforcement is cleaned, passivated, and re-cover-checked. Substrate levels are corrected before the overlay membrane.

  4. 04

    Joint, crack, and detail treatment

    Construction joints, movement joints, and dormant cracks are detailed with reinforcement bands, sealants, and where required, polyurethane injection — establishing a continuous waterproof envelope before the main membrane is applied.

  5. 05

    HVAC, drain, and penetration detailing

    HVAC kerbs, drain bowls, parapet upstands, and pipe penetrations are detailed with reinforced corner bands and elastomeric flashings. Every penetration is treated as a discrete waterproofing detail with documented method.

  6. 06

    Replacement waterproofing systems

    Where existing membranes are beyond rehabilitation, we strip back to substrate and install replacement systems — bitumen membrane, liquid polyurethane, or polyurea — specified to the asset class, exposure, and service life requirements.

  7. 07

    QA / QC and warranty

    Every project is documented end-to-end: substrate logs, primer DFT, membrane DFT, adhesion pull-off testing, holiday detection, and flood testing where applicable. Project warranty is issued on handover with the full QA record.

Request a roof site assessment

Share your project details and requirements, and our team will get in touch to discuss the most suitable solution.

Contact us

Roof Rehabilitation — frequently asked questions

Start your project

Specify Roof Rehabilitation on your next project.

Share your project details and requirements, and our team will get in touch to discuss the most suitable solution.