Municipal Irrigation Reservoir Rehabilitation
PROJECT // 01·Infrastructure·2024

Municipal Irrigation Reservoir Rehabilitation

Strip-out of failed lining, substrate repair, and 3 mm pure polyurea internal lining.

ClientConfidential — Government Authority
LocationAbu Dhabi
Area8,500 m²
Duration14 weeks
ServiceWaterproofing
01 / The challenge

What we found on site

The existing substrate showed extensive deterioration — failed membranes, active leaks, and chloride-laden concrete that compromised long-term performance.

02 / Our approach

How TEXSA delivered

TEXSA mobilised a specialist crew for full strip-out, substrate repair, and reinstatement using pure polyurea + epoxy primer. Works were sequenced around live operations with full QA/QC documentation.

03 / The result

Outcome on handover

Strip-out of failed lining, substrate repair, and 3 mm pure polyurea internal lining. Delivered on programme with a 10-year system warranty and zero post-handover defects to date.
04 / Transformation

Drag to reveal

Municipal Irrigation Reservoir Rehabilitation — before rehabilitationBefore
Municipal Irrigation Reservoir Rehabilitation — after rehabilitationAfter
REF_TX01 · Before / AfterAbu Dhabi
05 / Specification

System data sheet

System specificationDATA_SHEET
System
Pure polyurea + epoxy primer
Area
8,500 m²
Duration
14 weeks
Sector
Infrastructure
Service
Waterproofing
Location
Abu Dhabi
Year
2024
Client
Confidential — Government Authority
07 / Documentation

On-site photography

IMG_01Municipal Irrigation Reservoir Rehabilitation — photo 1
Municipal Irrigation Reservoir Rehabilitation — photo 2
Municipal Irrigation Reservoir Rehabilitation — photo 3
Municipal Irrigation Reservoir Rehabilitation — photo 4
Municipal Irrigation Reservoir Rehabilitation — photo 5
Municipal Irrigation Reservoir Rehabilitation — photo 6
08 / Verified results
8,500 m²
Area delivered
14 weeks
Programme
10 yr
System warranty
0
Post-handover defects