Municipal Irrigation 3 Existing Reservoir Rehabilitation - ALFalah City

Rehabilitation of 3 existing municipal irrigation reservoirs including removal of failed epoxy lining, concrete repair, leak treatment, surface preparation, and application of a 2 mm pure polyurea protective lining system

ClientAbu Dhabi City Municipality
LocationAbu Dhabi, UAE
Area21,000 m²
Duration12 weeks
ServiceWaterproofing
Year2024

Project overview

Rehabilitation of 3 existing recycled water irrigation reservoirs in Al Falah City, Abu Dhabi, including removal of deteriorated epoxy lining systems, concrete repair, leak treatment, surface preparation, and installation of a seamless pure polyurea protective lining system.

The challenge

The existing epoxy coating system showed signs of deterioration, cracking, debonding, and water leakage in multiple areas. Long-term exposure to moisture, operational conditions, and substrate movement affected the performance of the existing lining system

Existing condition

Existing internal epoxy coating system with localized coating failure, cracks, debonded areas, water leakage points, and damaged concrete surfaces.

Our approach

Application of a pure polyurea waterproofing and protective lining system following substrate rehabilitation, crack treatment, leak sealing, and surface preparation works.

Execution methodology

Removal of failed epoxy coating and weak surface areas Concrete surface preparation and profiling Crack repair and water leak sealing treatment Concrete rehabilitation and surface leveling Primer and filler application Detailing of joints, penetrations, and critical areas Application of 2 mm hot spray pure polyurea lining system Final QA/QC inspection and testing

Quality control & verification

Surface preparation inspection Moisture and substrate condition checks DFT measurement Visual inspection Adhesion verification Final waterproofing inspection

System specification

System
Injection System PU leak sealing injection system Crack Repair Structural crack repair and treatment system Concrete Repair Polymer-modified concrete repair materials Protective Lining Hot spray pure polyurea coating system
Area
21,000 m²
Duration
12 weeks
Sector
Infrastructure
Service
Waterproofing
Location
Abu Dhabi, UAE
Year
2024
Client
Abu Dhabi City Municipality

Before / after

Municipal Irrigation 3 Existing Reservoir Rehabilitation - ALFalah City  — before rehabilitationBefore
Municipal Irrigation 3 Existing Reservoir Rehabilitation - ALFalah City  — after rehabilitationAfter

Abu Dhabi, UAE

Stage by stage

Municipal Irrigation 3 Existing Reservoir Rehabilitation - ALFalah City  — stage 1 beforeBefore
Municipal Irrigation 3 Existing Reservoir Rehabilitation - ALFalah City  — stage 1 afterAfter
Stage 01 - Surface preparation
Municipal Irrigation 3 Existing Reservoir Rehabilitation - ALFalah City  — stage 2 beforeBefore
Municipal Irrigation 3 Existing Reservoir Rehabilitation - ALFalah City  — stage 2 afterAfter

On-site photography

Municipal Irrigation 3 Existing Reservoir Rehabilitation - ALFalah City — photo 1
Municipal Irrigation 3 Existing Reservoir Rehabilitation - ALFalah City — photo 2
Municipal Irrigation 3 Existing Reservoir Rehabilitation - ALFalah City — photo 3
Municipal Irrigation 3 Existing Reservoir Rehabilitation - ALFalah City — photo 4
Municipal Irrigation 3 Existing Reservoir Rehabilitation - ALFalah City — photo 5
Municipal Irrigation 3 Existing Reservoir Rehabilitation - ALFalah City — photo 6
Municipal Irrigation 3 Existing Reservoir Rehabilitation - ALFalah City — photo 7
Municipal Irrigation 3 Existing Reservoir Rehabilitation - ALFalah City — photo 8
Municipal Irrigation 3 Existing Reservoir Rehabilitation - ALFalah City — photo 9
Municipal Irrigation 3 Existing Reservoir Rehabilitation - ALFalah City — photo 10
10 images
Start your project

Have a similar project?

Send drawings and a site condition summary — we'll respond with a system proposal and indicative programme.

View projects
CallWhatsApp