What we found on site
New warehouse slab required a hard-wearing, low-dust floor capable of withstanding heavy MHE traffic with clearly defined racking aisles and safety walkways within a tight handover window.
How TEXSA delivered
TEXSA shot-blasted the slab to the required surface profile, corrected levels with a self-smoothing epoxy and finished with a PU topcoat. Racking lines, pedestrian walkways and hazard zones were marked per the operator's layout drawings.
Outcome on handover
Floor handed over inside the contractual window with full slip-resistance and adhesion sign-off, allowing rack installation to start immediately.
Drag to reveal
System data sheet
- System
- Self-levelling epoxy (3 mm) with UV-stable PU topcoat and demarcation lines
- Area
- 18,000 m²
- Duration
- 16 weeks
- Sector
- Industrial
- Service
- Flooring
- Location
- KIZAD, Abu Dhabi
- Year
- 2023
- Client
- Confidential — Logistics Operator