What we found on site
The basement was experiencing chronic water ingress through structural cracks and cold joints, with active leaks across plant rooms and parking levels that were impacting building services.
How TEXSA delivered
TEXSA mapped active leak paths, drilled and installed mechanical packers, then injected hydrophobic PU resin under controlled pressure. Each zone was monitored for re-occurrence before closure and the surface was reinstated.
Outcome on handover
All active leak paths sealed and verified dry across two wet cycles. The FM team received a full as-built map of injection points for future reference.
Drag to reveal
System data sheet
- System
- Hydrophobic polyurethane crack injection with packers, finished with cementitious caulking
- Area
- 1,800 lm
- Duration
- 6 weeks
- Sector
- Commercial
- Service
- Injection & Repair
- Location
- Abu Dhabi, UAE
- Year
- 2022
- Client
- Confidential — FM Operator