What we found on site
Active leakage through construction joints and chloride/sulphate attack on the inner tank face required both structural sealing and a chemically resistant relining before the plant could be re-commissioned.
How TEXSA delivered
TEXSA injected active cracks with hydrophobic PU, reinstated the concrete profile with sulphate-resistant repair mortars and applied a polyurea-hybrid lining engineered for STP exposure, with adhesion and holiday testing per tank.
Outcome on handover
Tanks returned to the utility leak-free, with full QA/QC documentation and a chemical-resistance system warranty.
Drag to reveal
System data sheet
- System
- Polyurethane crack injection, cementitious repair mortars and polyurea-hybrid chemical-resistant lining
- Area
- 3,400 m²
- Duration
- 12 weeks
- Sector
- Infrastructure
- Service
- Injection & Repair
- Location
- Al Ain, UAE
- Year
- 2023
- Client
- Confidential — Utility