01 / The challenge

What we found on site

The existing substrate showed extensive deterioration — failed membranes, active leaks, and chloride-laden concrete that compromised long-term performance.

02 / Our approach

How TEXSA delivered

TEXSA mobilised a specialist crew for full strip-out, substrate repair, and reinstatement using polyurea hybrid + repair mortars. Works were sequenced around live operations with full QA/QC documentation.

03 / The result

Outcome on handover

Concrete repair, crack injection, and chemical-resistant lining. Delivered on programme with a 10-year system warranty and zero post-handover defects to date.
04 / Transformation

Drag to reveal

STP Concrete Tank Rehabilitation — before rehabilitationBefore
STP Concrete Tank Rehabilitation — after rehabilitationAfter
REF_TX04 · Before / AfterAl Ain
05 / Specification

System data sheet

System specificationDATA_SHEET
System
Polyurea hybrid + repair mortars
Area
3,400 m²
Duration
12 weeks
Sector
Infrastructure
Service
Injection & Repair
Location
Al Ain
Year
2023
Client
Confidential — Utility
07 / Documentation

On-site photography

IMG_01STP Concrete Tank Rehabilitation — photo 1
STP Concrete Tank Rehabilitation — photo 2
STP Concrete Tank Rehabilitation — photo 3
STP Concrete Tank Rehabilitation — photo 4
STP Concrete Tank Rehabilitation — photo 5
STP Concrete Tank Rehabilitation — photo 6
08 / Verified results
3,400 m²
Area delivered
12 weeks
Programme
10 yr
System warranty
0
Post-handover defects