01 / The challenge
What we found on site
The existing substrate showed extensive deterioration — failed membranes, active leaks, and chloride-laden concrete that compromised long-term performance.
02 / Our approach
How TEXSA delivered
TEXSA mobilised a specialist crew for full strip-out, substrate repair, and reinstatement using polyurea hybrid + repair mortars. Works were sequenced around live operations with full QA/QC documentation.
03 / The result
Outcome on handover
Concrete repair, crack injection, and chemical-resistant lining. Delivered on programme with a 10-year system warranty and zero post-handover defects to date.
04 / Transformation
Drag to reveal
Before
AfterREF_TX04 · Before / AfterAl Ain
05 / Specification
System data sheet
System specificationDATA_SHEET
- System
- Polyurea hybrid + repair mortars
- Area
- 3,400 m²
- Duration
- 12 weeks
- Sector
- Infrastructure
- Service
- Injection & Repair
- Location
- Al Ain
- Year
- 2023
- Client
- Confidential — Utility
06 / Stage by stage
Gallery
Before
After
Before
After07 / Documentation
On-site photography
IMG_01






