What we found on site
Podium needed a buried waterproofing system that would survive landscape installation, planter root penetration and long-term hydrostatic load without future intervention.
How TEXSA delivered
TEXSA applied a primed pure polyurea membrane with full flood-test sign-off, followed by a drainage composite and protection board prior to backfill. Critical penetrations were detailed with reinforced polyurea coves.
Outcome on handover
Flood-test passed first attempt across all zones. Landscaping was reinstated on programme with documented as-built drawings for the FM team.
Drag to reveal
System data sheet
- System
- Pure polyurea on primed concrete with drainage composite and protection board
- Area
- 6,200 m²
- Duration
- 10 weeks
- Sector
- Commercial
- Service
- Waterproofing
- Location
- Abu Dhabi, UAE
- Year
- 2023
- Client
- Confidential — Developer