01 / The challenge
What we found on site
The existing substrate showed extensive deterioration — failed membranes, active leaks, and chloride-laden concrete that compromised long-term performance.
02 / Our approach
How TEXSA delivered
TEXSA mobilised a specialist crew for full strip-out, substrate repair, and reinstatement using pure polyurea + drainage composite. Works were sequenced around live operations with full QA/QC documentation.
03 / The result
Outcome on handover
Podium and planter waterproofing under landscaped overburden. Delivered on programme with a 10-year system warranty and zero post-handover defects to date.
04 / Transformation
Drag to reveal
Before
AfterREF_TX03 · Before / AfterAbu Dhabi
05 / Specification
System data sheet
System specificationDATA_SHEET
- System
- Pure polyurea + drainage composite
- Area
- 6,200 m²
- Duration
- 10 weeks
- Sector
- Commercial
- Service
- Waterproofing
- Location
- Abu Dhabi
- Year
- 2023
- Client
- Confidential — Developer
06 / Stage by stage
Gallery
Before
After
Before
After07 / Documentation
On-site photography
IMG_01






