Mixed-use tower podium waterproofed under landscaped overburden.

6,200 m² of podium and planter waterproofing under landscaped overburden using pure polyurea with a drainage composite — engineered for root resistance, hydrostatic load, and 25-year design life.

ClientConfidential — Developer
LocationAbu Dhabi, UAE
Area6,200 m²
Duration10 weeks
ServiceWaterproofing
01 / The challenge

What we found on site

Podium decks above occupied retail and parking required a waterproofing system that would survive landscape installation, root penetration, and decades of hydrostatic pressure.

Programme constraints required completion before landscape and hardscape contractors mobilised — a fixed 10-week window with no opportunity for re-entry once overburden was placed.

Complex geometry: planter walls, drainage outlets, expansion joints, and irrigation penetrations all demanded detail-level engineering rather than a generic spray application.

02 / Our approach

From survey to handover

Step 01

Substrate preparation

Shot-blasting to CSP 4 across the deck, with localised diamond grinding at upstands and joints. Moisture content verified below 4% before priming.

Step 02

Detail-first sequence

All planter upstands, joints, drains, and penetrations were detailed with reinforced polyurea before the field application — eliminating the most common failure paths.

Step 03

Pure polyurea field application

2.5 mm pure polyurea spray-applied across the deck and walls in a single continuous pass per zone, with overlap controls at zone boundaries.

Step 04

Drainage composite & protection

Cuspated drainage composite + geotextile protection layer installed directly over the cured polyurea, ready to receive growing medium and hardscape.

Step 05

Handover to landscape package

Joint inspection with the landscape contractor confirmed integrity before overburden placement, with the system warranty handed to facilities management.

03 / The solution

System breakdown

Component_01

Pure polyurea waterproofing

Seamless 2.5 mm membrane providing root-resistant, fully bonded waterproofing across deck, upstands, and planter walls.

Component_02

Drainage composite

Cuspated HDPE drainage layer with bonded geotextile filter — discharges water to outlets and protects the membrane during landscape installation.

Component_03

Engineered detail system

Reinforced polyurea details at every penetration, joint, and upstand — sequenced before field application to lock in long-term performance.

System specification
Membrane
Pure polyurea, 2.5 mm DFT
Drainage composite
Cuspated HDPE + geotextile
Root resistance
Certified per FLL
Hydrostatic head
Designed for full overburden
04 / Verified results
6,200 m²
Podium waterproofed
10 wk
Window delivered
25 yr
Design life
100%
Detail coverage